Environmental Assessment

Upper Collinsville Dam, FERC Licensing Environmental Support

ASA was engaged by Canton Hydro as the prime environmental consultant to conduct the required environmental studies. ASA conducted a pre- and post construction habitat survey, water quality monitoring study to develop information regarding the types and distributions of aquatic habitats and levels of dissolved oxygen within the bypass reach of the Project.

Learn More

Environmental Impact Analysis for Proposed Pilgrim Pipeline

ASA Assisted the NYS Thruway Authority with preparing a SEQR EIS for a right-of-way variance to site two parallel pipelines to transport Bakken crude oil and refined fuels along the NYS Thruway and Hudson River corridor between Albany, NY and refineries in NJ.

Learn More