§ 316(b) Application Requirements for Vistra Cooling Lake and Ohio River Facilities

ASA identified, implement, and prepare the field studies and § 122.21(r) reports for seven Dynegy facilities located on Illinois cooling lakes and the Ohio River. Serving as the prime contractor, ASA assisted Dynegy in formulating an approach strategy to completing the (r)-reports and was responsible for the quality and timely completion of several studies and reports required under the § 316(b) Rule.

Learn More

Upper Collinsville Dam, FERC Licensing Environmental Support

ASA was engaged by Canton Hydro as the prime environmental consultant to conduct the required environmental studies. ASA conducted a pre- and post construction habitat survey, water quality monitoring study to develop information regarding the types and distributions of aquatic habitats and levels of dissolved oxygen within the bypass reach of the Project.