ASA has recently been awarded an Electric Power Research Institute (EPRI) contract to evaluate the behavior and impact to fish when they are returned to thermal plumes. Site-specific constraints may require a long fish return to get impinged fish back to the waterbody. Longer fish returns are costly to construct, require increased maintenance, and have the potential t